Jul 08, 2025  
College Catalog 2023-2024 
    
College Catalog 2023-2024 [ARCHIVED CATALOG]

CONST 152 - Erosion and Sediment Control Plan Implementation


3 Total Credits
This course teaches the implementation of the Erosion and Sediment Control Plan (ESC) for construction sites with earth disturbance activities. It covers the construction stormwater pollution prevention guidance provided in the most recent version of: a) The Washington State Department of Ecology Stormwater Management Manual for Western Washington, or b) The Washington State Department of Ecology Stormwater Management Manual for Eastern Washington. Students will learn how to design an Erosion and Sediment Control Plan Implementation Tool (ESCPIT).

Prerequisite(s): Completion of CONST 150  with a 1.0 or higher.

Course Outcomes
  1. Design and develop an ESCPIT based on the CSWGP and an ESCP.
  2. Implement the ESCP.